Client
The London Full Gospel Central Church
Area of Advice
Project management and general construction advice
Details
The property is located off West Barnes Lane. The property was
originally leased out to the Inland Revenue as offices by the client.
At the end of the term of the lease the building reverted back to the
client who then subsequently applied for change of use to D1
non-residential institution, as a place of worship and public use.
Our Role
NJC was employed half way through the project as the relationship
between the client and the main contractor was becoming unstable. The
main role was to act as the project manager, co-ordinate between the
two parties and ensure that all works were completed on time to the
satisfaction of the client. Some of the drawings were in Korean and
materials were also shipped from Korea and China which made this
particular role distinctive and interesting.
![]() |
![]() |
![]() |
![]() |